Victoria state police say a small plane has crashed into a shopping centre near Melbourne in Australia - 8hrs ago

Alerts (0)

No Alerts

Severe Traffic (0)

No Significant Events

General and Future Traffic (0)

No Significant Events

Roadworks (11)

A40 Greenford Roundabout (UB6) (Ealing)

Works [TfL] - Greenford Roundabout (All Directions) - Temporary traffic signals are in place to allow for traffic signal modernisation and footway works. (#150640)

Update 2 Hrs Ago 2017-02-21 05:45:55 
Traffic is flowing well.


[A40] Medway Underpass (A40 PERIVALE) (UB6) (Ealing)

Works [TfL] - [A40] Medway Underpass (A40 Perivale) (UB6) (Eastbound) - Lane closed to facilitate footway improvement works (nightly, 2200hrs to 0500hrs). (#149928)

Updated Earlier 2017-02-21 03:50:37 
All lanes open. Traffic is flowing well.


A40 [A4127] Greenford Roundabout (UB6) (Ealing)

Works [TfL] - [A4127] Greenford Roundabout (UB6) (Clockwise) at the junction of [A40] Western Avenue - Lane restrictions on the [A40] on-slips from Greenford Roundabout (A4127) between approximately 2200hrs and 0500hrs each night during overnight junction improvement works. Additionally, Oldfield Lane South is closed during the works. From Wednesday 1 February to Wednesday 22 March, inclusive, [A4127] Greenford Road (Both Directions) at the junction of Greenford Roundabout, lane three (of three) closed in both directions, each night, with both the inner and outer-most lanes of the roundabout closed. (#145904)

Updated Earlier 2017-02-21 02:43:02 
All lanes reopened. Traffic is flowing well.


[A40] Greenford Flyover (A40) (UB6) (Ealing)

Works [TfL] - [A40] Greenford Flyover (A40) (Eastbound) - The carriageway is down to one lane, with lanes one and two (of three) closed for pavement resurfacing works. (#151486)

Updated Earlier 2017-02-21 02:23:32 
Restrictions now removed. Traffic is flowing well.


[A40] Western Avenue (W3) (Ealing)

Works [TfL] - [A40] Western Avenue (All Directions) at the junction of Victoria Road - Restrictions in place to facilitate TfL footway works (#149647)

Much Earlier On 2017-02-20 21:55:28 
Works confined to footpath. Minor delays when carriageway restrictions are in place.


A40, Inner Ring [A4205] Praed Street (W2) (Westminster)

Works [Utility] - [A4205] Praed Street (W2 ) (Eastbound) at the junction of Edgware Road - Lane one (of three) closure for planned Thames Water utility works. Restrictions will remain in situ 24/7. (#151283)


[A40] Western Avenue (UB6) (Ealing)

Works [TfL] - [A40] Western Avenue (All Directions) at the junction of Greenford Roundabout - Various restrictions in place nightly, due to flyover bearing refurbishment (#143252)


Future Consideration, A40 [A312] Church Road (UB5) (Ealing)

Works [Utility] - [A312] Church Road (Southbound) at the junction of Target Roundabout - Lane closure to facilitate National Grid works (2000hrs to 0500hrs). (#149168)


[A40] Western Avenue (W3,W12) (Hammersmith & Fulham,Ealing)

Works [TfL] - [A40] Western Avenue (Westbound) at the junction of Old Oak Common Lane - No access to the westbound A40 from Old Oak Common Lane due to resurfacing works (2200hrs to 0500hrs). (#147743)


A40 [A501] Marylebone Flyover (NW1,W2) (Westminster)

Works [TfL] - [A501] Marylebone Flyover (NW1) (Both Directions) - Lane closures to facilitate overnight upgrade works (weeknights, 2200hrs to 0500hrs). (#145507)


A406, A40 [A406] Hanger Lane (NORTH CIRCULAR ROAD) ROUNDABOUT (NW10,W5,W3) (Ealing)

Works [TfL] - Hanger Lane (North Circular Road) Roundabout (W5 /NW10) (All Directions) - Various lane restrictions in place to facilitate works (Overnight only). (#145138)

Traffic Cameras

A40 Traffic Cameras

A40 Traffic Map