Police in Finland say security has been increased at Helsinki airport and train stations in the region after several stabbings in Turku - 3m ago

A40 Road

Alerts (0)

No Alerts

Severe Traffic (5)

A40 [A4127] Greenford Roundabout (UB6) (Ealing)

Works [TfL] - [A4127] Greenford Roundabout (UB6) at the junction of A40 Western Avenue - From 31st July to 13th September a lane will be closed on the Greenford Roundabout 24 hours a day. The works are for essential bridge maintenance, including bearing replacement, concrete repairs, resurfacing and drainage repairs. Lane three (of three) is closed on Greenford Road in both directions approaching the roundabout. Inner ring also closed on the roundabout. (#162256)

Update Just In! 2017-08-18 14:08:54 
Traffic is slow moving northbound with queues back to Ruislip Road. Expect delays.


A40 [A4180] West End Road (HA4) (Hillingdon)

Works [Borough] - [A4180] West End Road (Northbound) between West End Road Roundabout and Wingfield Way - The carriageway is restricted for footway work. There will be occasional traffic control using Stop/Go boards. (#163452)


[A40] Westway (W12) (Hammersmith & Fulham)

Works [Utility] - [A40] Westway (W12) (Westbound) at the junction of Primula Street - Lane one (of three) is closed for UKPN works to repair a fault. (#167424)

Much Earlier On 2017-08-18 06:21:38 
Traffic is flowing well.


A40 [A4127] Greenford Roundabout (UB6) (Ealing)

Works [TfL] - [A4127] Greenford Roundabout (UB6) at the junction of A40 Western Avenue - From 31st July to 13th September a lane will be closed on the Greenford Roundabout 24 hours a day. The works are for essential bridge maintenance, including bearing replacement, concrete repairs, resurfacing and drainage repairs. Lane three (of three) is closed on Greenford Road in both directions approaching the roundabout. Inner ring also closed on the roundabout. (#162256)

Much Earlier On 2017-08-18 06:07:00 
Traffic is flowing well.


Inner Ring, A41, Western Cross Route, A40 [A40] Westway (W10,W12,W2,W11) (Kensington & Chelsea,Hammersmith & Fulham,Westminster)

Works [TfL] - [A40] Westway (W10) (Both Directions) between [A219] Wood Lane and Paddington Slip Road and the [A5] Edgware Road - Various restrictions between approximately 2200hrs and 0600hrs on the nights specified during maintenance. Monday 4 and Tuesday 5 September, [A404] Harrow Road (Westbound) beneath [A40] Westway, closed. Wednesday 6th September closure of the Wood Lane westbound entry slip road onto the A40 Westway. (#162234)

Much Earlier On 2017-08-17 21:42:33 
Restrictions removed. Works resume at 2200hrs.

General and Future Traffic (5)

[A40] Notting Hill Carnival Event Area (W10) (Kensington & Chelsea)

Special and Planned Events [Parade/Celebration] - NOTTING HILL CARNIVAL EVENT AREA - (All Directions) - EVENT PREPARATION - Due to event preparation prior to the Notting Hill Carnival the following roads may be subject to restrictions and closures from 21:00 onwards: Bishop┬┐s Bridge Rd, Great Western Rd, Ladbroke Grove North, Notting Hill Gate. From 0200 onwards. Westbourne Park Road (between Great Western Road and Ladbroke Grove), Elgin Crescent, Kensington Park Road (between Westbourne Grove and Elgin Crescent), Cambridge Gardens (between St Marks Road and Ladbroke Grove). Great Western Road will have lane restrictions to install barriers and will operate with alternate lane working. London buses may be on diversion around the closures if necessary. (#167906)


[A40] Notting Hill Carnival Event Area (W10) (Kensington & Chelsea)

Special and Planned Events [Parade/Celebration] - NOTTING HILL CARNIVAL EVENT AREA - (All directions) - Extensive road closures will be implemented to create a car free environment for the Carnival to take place. Closure times - Sunday 27th August - 0700 - 2359 (Approximately), Monday 28th August from 0700 to approximately 0300 on Tuesday morning, or when the Metropolitan Police deem it safe to do so after the area has been cleansed. Road closures will be from Harrow Road in the north, Notting Hill Gate in the south, North Pole Road in the west and Queensway in the east. Please be aware, traffic levels around the event area are likely to be slow moving including, A5 Edgware Road, Harrow Road, Holland Park Avenue, Notting Hill Gate and Bayswater Road. (#167901)


[A40] Notting Hill Carnival Event Area (W10) (Kensington & Chelsea)

Special and Planned Events [Parade/Celebration] - NOTTING HILL AREA - (All directions)) - Possible restrictions and temporary closures in place for bank holiday weekend event preparations. (#167796)


A40 [A4206] Westbourne Bridge (W2) (Westminster)

Special and Planned Events [Construction Activity] - Westbourne Bridge (W2 ) (All Directions) and Westbourne Terrace between (A40) Westway and Bishops Bridge Road - The road is closed to facilitate works. (#167338)


A40, Inner Ring [A4205] Praed Street (W2) (Westminster)

Special and Planned Events [Construction Activity] - [A4205] Praed Street (W2 ) (Both Directions) between Edgware Road and Eastbourne Terrace - The road is closed to facilitate construction works. (#166269)

Roadworks (11)

A40 [A4127] Greenford Roundabout (UB6) (Ealing)

Works [TfL] - [A4127] Greenford Roundabout (UB6) at the junction of A40 Western Avenue - From 31st July to 13th September a lane will be closed on the Greenford Roundabout 24 hours a day. The works are for essential bridge maintenance, including bearing replacement, concrete repairs, resurfacing and drainage repairs. Lane three (of three) is closed on Greenford Road in both directions approaching the roundabout. Inner ring also closed on the roundabout. (#162256)

Update Just In! 2017-08-18 14:08:54 
Traffic is slow moving northbound with queues back to Ruislip Road. Expect delays.


A406, A40 [A40] Hanger Lane Tunnel (W5,W3) (Ealing)

Works [TfL] - [A40] Hanger Lane Tunnel (W3 ) (Westbound) - The tunnel will be closed overnight (2200hrs to 0500hrs) to facilitate maintenance works. The closure will be westbound on the night of the 24th and eastbound on the night of the 25th. Traffic will divert via the slip roads. (#168091)


[A40] Western Avenue (UB8,UB10) (Hillingdon)

Works [TfL] - [A40] Western Avenue (UB10/UB8) (Both Directions) between Swakeleys Roundabout and Long Lane - Lane 3 closed to facilitate grass cutting works (2200hrs to 0500hrs). (#168071)


A40 [A4180] West End Road (HA4) (Hillingdon)

Works [Borough] - [A4180] West End Road (Northbound) between West End Road Roundabout and Wingfield Way - The carriageway is restricted for footway work. There will be occasional traffic control using Stop/Go boards. (#163452)


[A40] Westway (W12) (Hammersmith & Fulham)

Works [Utility] - [A40] Westway (W12) (Westbound) at the junction of Primula Street - Lane one (of three) is closed for UKPN works to repair a fault. (#167424)

Much Earlier On 2017-08-18 06:21:38 
Traffic is flowing well.


A40 [A4127] Greenford Roundabout (UB6) (Ealing)

Works [TfL] - [A4127] Greenford Roundabout (UB6) at the junction of A40 Western Avenue - From 31st July to 13th September a lane will be closed on the Greenford Roundabout 24 hours a day. The works are for essential bridge maintenance, including bearing replacement, concrete repairs, resurfacing and drainage repairs. Lane three (of three) is closed on Greenford Road in both directions approaching the roundabout. Inner ring also closed on the roundabout. (#162256)

Much Earlier On 2017-08-18 06:07:00 
Traffic is flowing well.


[A40] Western Avenue (UB9,UB10,UB8) (Hillingdon)

Works [Other] - [A40] Western Avenue (UB10/UB8) (Both Directions) between Swakeleys Roundabout and M40 J1 - Various overnight lane restrictions and a 24 hour 50 MPH speed limit to facilitate street lighting upgrade works (night works). (#164166)

Much Earlier On 2017-08-18 03:10:58 
Restrictions removed. Works resume at 2200hrs.


Inner Ring, A41, Western Cross Route, A40 [A40] Westway (W10,W12,W2,W11) (Kensington & Chelsea,Hammersmith & Fulham,Westminster)

Works [TfL] - [A40] Westway (W10) (Both Directions) between [A219] Wood Lane and Paddington Slip Road and the [A5] Edgware Road - Various restrictions between approximately 2200hrs and 0600hrs on the nights specified during maintenance. Monday 4 and Tuesday 5 September, [A404] Harrow Road (Westbound) beneath [A40] Westway, closed. Wednesday 6th September closure of the Wood Lane westbound entry slip road onto the A40 Westway. (#162234)

Much Earlier On 2017-08-17 21:42:33 
Restrictions removed. Works resume at 2200hrs.


[A40] Western Avenue (W3) (Ealing)

Works [Utility] - [A40] Western Avenue (W3 ) (Westbound) at the junction of Dukes Road - Lane one is closed to facilitate Thames Water works. (#168028)


[A40] Western Avenue (W3) (Ealing)

Works [TfL] - [A40] Western Avenue (All Directions) at the junction of [A4000] Leamington Park and [A4000] Wales Farm Road - Lane restrictions on approach to the junction between approximately 2200hrs and 0500hrs each night during traffic signal modernisation works. (#162855)


[A40] Target Underpass (A40) (UB6,UB5) (Ealing)

Works [TfL] - [A40] Target Underpass (A40) (UB5) (All Directions) - Various closures in place nightly due to bridge deck waterproofing. (#157416)

Traffic Cameras

A40 Traffic Cameras

A40 Traffic Map