Premium Access

Get Premium Access To View All Traffic Alerts, Maps, Cameras & Roadworks

Severe Traffic (5)

M25 Junction 27 (M11 J6) (CM16)

Works [Other] - M25 between J27 (M11) and J28 (A12) - Motorway closed to facilitate resurfacing works. Diversion via M11, A406 and A12 (night works). For further information visit Highways England website. (#202989)

Update 2 Hrs Ago 2018-11-13 23:27:32 
Delays reported on approach to the closure. Use an alternative route.


A205, A2, Blackwall Tunnel A102 (SE3,SE10) (Greenwich)

Works [TfL] - [A102 / A2] (SE10/SE3/SE9/DA16) Blackwall Tunnel Southern Approach and Rochester Way Relief Road (Both Directions) - Various nightly lane closures, including full slip road closures, over a number of phases to facilitate maintenance works (2200hrs to 0530hrs). (#201609)

Update 2 Hrs Ago 2018-11-13 23:20:34 
A102 lanes one, two and three (of four) closed southbound at Woolwich Road, the exit slip is also closed. Traffic is slow through the area.


Blackwall Tunnel O2 Arena, Greenwich () (Greenwich)

Special and Planned Events [Sporting] - O2 Arena - Nitto ATP Finals. Expect delays on Millennium Way, West Parkside and Edmund Halley Way after the event has finished. Events start at 1200hrs and 1800hrs on Sunday 11th November, 1200hrs and 1800hrs on Monday, 1200hrs and 1800hrs on Tuesday, 1200hrs and 1800hrs on Wednesday, 1200hrs and 1800hrs on Thursday, 1200hrs and 1745hrs on Friday, 1200hrs and 1800hrs on Saturday and 1530hrs on Sunday 18th November. (#183124)

Updated Earlier 2018-11-13 19:32:34 
Expect delays before during and after the event


A12 [A11] Whitechapel Road (E1) (Tower Hamlets)

Works [Other] - [A11] Whitechapel Road (E1) (Both Directions) at the junction of East Mount Street - Temporary signals in operation 2000hrs-0500hrs to facilitate Crossrail works. Footway works 0800hrs-1700hrs. Eastbound bus lane closed 24 hours a day. Westbound lane closures 2000hrs-0500hrs. (#201437)

Much Earlier On 2018-11-13 14:45:59 
Delays are possible.


[A127] Southend Arterial Road (RM2) (Havering)

Works [TfL] - Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions and a contra-flow in operation during bridge replacement works. Find out more about the Ardleigh Green bridge replacement. (#117841)

Much Earlier On 2018-11-13 14:41:45 
Delays possible whilst restrictions are in place.

Cameras: North Side

Blackwall Tunnel: Traffic Cameras - North Side

E India Dock Rd/Chrisp St

* Get Premium Access To View All Cameras

Cameras: South Side

Blackwall Tunnel: Traffic Cameras - South Side

* Get Premium Access To View All Cameras

A102 Traffic Map

Get Premium Access To View Live Traffic Maps

Scheduled Closures

Blackwall Tunnel Closures


See ROADWORKS Section in Premium Access

Tunnel Restrictions

Blackwall Tunnel Restrictions


ADR Restrictions: Category E

Northbound (West Bore):
Height 4.00 meters max & Lane Width 2.00 meters wide

Southbound (East Bore):
Height 4.72 meters max & Lane Width 2.00 meters wide

Maximum Vehicle Length: No Restrictions

Variable Speed Limit: 20 to 30 mph

Tunnel Length: 1345 meters (Northbound)

No Pedestrians and No Cyclists

WARNING: Fixed Penalty (FINE) If you run out of fuel inside the tunnel!

Trucks CHECK your vehicle HEIGHT or you will be DIVERTED

Alternative Routes

Blackwall Tunnel Alternative Routes


During Blackwall Tunnel closures, accidents, maintenance or restrictions you have a few options:

Vehicle Option 1: Rotherhithe Tunnel

[Vehicle Length 10m Max | 4.4m Max Height | 20mph | 2.3m Lane Width | Walking/Cycling Allowed]

via North Side - 1.9 miles (3.0 km) / 5 minutes to the West

via South Side - 4.9 miles (7.9 km) / 14 minutes to the West

Vehicle Option 2: Woolwich Ferry (Free Service) - [Check Woolwich Ferry Page For Updates]

Open Generally 6.10am to 8-10pm Mon-Fri | 11.30am to 7.30pm Sun

4.7m Max Height | 3.5m Max Width | No Hazchem | Walking Via Foot Tunnel Optional

via North Side - 3.9 miles (6.2 km) / 11 minutes to the East

via South Side - 2.9 miles (4.7 km) / 7 minutes to the East

Vehicle Option 3: Dartford Crossing (Toll Crossing)

[4.9m Max Height | Toll £2.00 Cars / £5 Trucks | Free 10pm to 6am | No Walking

[Cycling Allowed: Arrive at control gates and a patrol car will transport you free of charge]

via North Side - 15.8 miles (25.4 km) / 26 minutes to the West

via South Side - 19.2 miles (30.9 km) / 31 minutes to the West

Vehicle Option 4: Tower Bridge

[Open 24hrs | 18 Tonnes Max Weight | Walking/Cycling Allowed]

via North Side - 3.1 miles (5.0 km) / 9 minutes to the West

via South Side - 5.9 miles (9.5 km) / 18 minutes to the West

Tube Option 1: Blackwall DLR via Canning Town DLR to North Greenwich Station

via North Side - 0.4 miles (0.6 km) / 1 minutes to the South

via South Side - 1.3 miles (2.1 km) / 5 minutes to the East

Tube Option 2: Island Gardens DLR to Cutty Sark DLR

via North Side - 1.9 miles (3.1 km) / 5 minutes to the South West

via South Side - 2.5 miles (4.0 km) / 5 minutes to the East

Walking Option 1: Greenwich Foot Tunnel

[Open 24hrs (See Greenwich Council for Latest Works) | 371m Long | Bicycles Allowed | No Cars]

via North Side - 2.0 miles (3.2 km) / 5 minutes to the West - [Check opening times]

via South Side - 2.3 miles (3.7 km) / 5 minutes to the West - [Check opening times]

*Travel time estimated using standard car speeds at low traffic volumes

*To estimate walking time instead of drive time - work on 3 mph at good pace

*The only bus route through the tunnel is the 108 from Stratford to Lewisham